The charger itself is provided to you at no cost as part of the project. However, as a site host, you will be responsible for the cost of the installation, which could include but are not limited to site preparation work, upgrades to the electrical panel, trenching, pouring a concrete slab, the installation of the charging unit, increases in the cost of electricity, dedicated parking spaces, and signage.